Project
modifications to the sludge line of the civil waste treatment plant
Location
Grosseto
Year
2021
Plant capacity
two sections each consisting of 2 parallel lines
Payload Line
160sq.m (total) for the first section, 120sq.m (total) for the second section
PAL Green Division was responsible for modifications on the sludge line of a civil waste water treatment plant in Grosseto. In particular, it has built a hub for the delivery and treatment of all biological sludge produced. The plant is divided into two parts, each with specific functions.
Via delle industrie, n. 6/B
31047 Ponte di Piave (TV) Italy
+39 0422 852300
(Fax: +39 0422 853444)
PAL SRL - single-member company
Via delle Industrie 6/B31047 Ponte di Piave (TV) – Italy
Pal Green Division ©
Reg. Imp. TV/C.F. 00565260304 REA TV 171424
Certified e-mail address: pal@pec.it
Organizational, management and control model pursuant to Leg. Decree 231/2001